You are accessing the Global Goodman site from Australia. Are you looking for your local Goodman site?

Overview

As a global logistics provider Rhenus Logistics requires large storage capacity and flexible real estate solutions for its various customers. The Group relied on Goodman’s many years of project experience for the development of the property.

Within a construction period of just six months a modern facility was developed, which meets the specific requirements of contract logistics. 22,000 sqm of warehouse space, 20 loading doors and a free height of twelve meters ensure flexible usage for the customer.

The new building extends the capabilities of the logistics service provider in the economically strong Rhine-Main area. Rhenus particularly benefits from excellent accessibility and infrastructure in the "An der Wann" industrial area that is focused on trading companies.

Through extensive greening and noise protection measures Goodman ensured the property fitted in with its regional environment. In addition, the property is silver certified by the German Sustainable Building Council (DGNB). 

Features

Accessibility

  • 40 km east of Frankfurt am Main
  • 1 km to A66
  • 15 km to A45

Delivery time

  • Project time: 6 months
  • Start of construction: February 2012
  • Delivery: July 2012

Technical specifications

  • Land area: 36,000 sqm
  • Land area: 41,000 sqm
  • Warehouse and logistics area: 22,000 sqm
  • Office space: 500 sqm
  • Overhead doors: 2
  • Loading docks: 20
  • Free height: 12 m
  • Floor loading – area: 70 kN/sqm
  • Floor loading – rack columns: 143 kN on load distribution plates of 196 cm² 

Through extensive greening and noise protection measures Goodman ensured the property fitted in with its regional environment.