Seifert Logistics (Daimler)

Overview

Seifert Logistics is responsible for the production supply of a plant for Daimler in Rastatt. The logistics service provider relied on Goodman’s expertise for the development of a new logistics centre in nearby Malsch.

The result is a property that is tailored to the needs of the automotive industry for the customer’s flexible use.

Goodman brought in its years of experience as a global project developer and investor and implemented a 46,000 sqm logistics centre in just nine months. The property offers roofed delivery zones with movable loading docks and high-speed doors. The material flow can be controlled in an efficient way that the production supply can occur JIS/JIT.

A key argument for Seifert Logistics was the sustainable design of the property. Goodman did not develop on a new site, but instead converted the grounds of a former concrete mixing plant.  A modern logistics centre has therefore been established in a well-developed industrial area. 

Features

Accessibility

  • Part of the Rhein-Neckar metropolitan region
  • 3 km to B3
  • 8 km to A5
  • 80 km to Mannheim harbour
  • 150 km to Frankfurt Airport

Delivery time

  • Project time: 8 months
  • Start of construction: October 2010
  • Delivery: May 2011

Technical specifications

  • Land area: 140,000 m²
  • Land area: 86,000 sqm
  • Warehouse and logistics area: 36,000 sqm
  • Office space: 1,600 sqm
  • Side loading: 8,300 sqm
  • Swing gates: 21
  • Overhead doors: 10
  • Free height: 10 m
  • Floor loading: 60 kN/sqm // 75 kN/leg on foot 80x120 mm

The material flow can be controlled in an efficient way that the production supply can occur JIS/JIT.